Phone number :02144074410

addres: tehran,bolvar ferdos shargh,

email : info@nooraemco.com

این یک عنوان است

برای تغییر این متن بر روی دکمه ویرایش کلیک کنید. لورم ایپسوم متن ساختگی با تولید سادگی نامفهوم از صنعت چاپ و با استفاده از طراحان گرافیک است.

سبد خرید

No products in the cart.

Package C project of Isfahan refinery development

arco
June 21,2021
1506 views
  • customer
    :

    Isfahan Refinery

  • Project Manager
    :

    Refinery manager

  • Executive project
    :

    ( A~E)

  • start date
    :

    1398/11/30

  • project budget
    :

    100,000,000 tomen

  • end date
    :

    1399/12/30

Brief description of the project:

Isfahan Refinery Process Development and Optimization Plan was defined in 5 packages (A ~ E) with the following objectives:

Reduction of production of heavy products (fuel oil) and increase of production of light and valuable products (mainly “gasoline”) by constructing new process units, improving the quality of main products (gasoline, kerosene and gas oil) in accordance with European petroleum products standard by constructing units Required process, stabilization of the optimal refining capacity at 373,000 barrels per day and increase operational flexibility by constructing a new distillation unit.

Mapna scope (package C): including construction operations, supply of equipment, installation and pre-commissioning of units: production and distribution of electricity and steam, water supply, refueling, instrumentation and service air, communications of process units and nitrogen distribution, refineries Water, industrial and sanitary effluents, flares and cylindrical and spherical tanks of the refinery and the execution of all relevant buildings).

Client: National Iranian Oil Engineering Company

Mapna scope (package C): including construction operations, equipment supply, installation and pre-commissioning of units: production and distribution of electricity and steam, water supply, refueling, instrumentation and service air, communications of process units and nitrogen distribution, refineries Water, industrial and sanitary effluents, flares and cylindrical and spherical tanks of the refinery and the execution of all relevant buildings).

Client: National Iranian Oil Engineering Company

Categories:

new project

Leave a Reply

Your email address will not be published. Required fields are marked *

Related Projects

Related Projects



Sign up and subscribe to our newsletter

We respect your privacy and send you important emails

    free consultation